Shower room is one of the products that many families choose, but many netizens are not professionals. They are curious about the installation steps of shower room. Today, Xiaobian will show you how to install shower room

shower room is one of the products that many families choose, but many netizens are not professionals. They are curious about the installation steps of shower room. Today, Xiaobian will show you how to install shower room

first, check whether the product package is complete, and check whether the configuration is complete after opening. Prepare necessary tools and put them together for easy access

second, install the bottom basin, combine the parts of the bottom basin, adjust the level of the bottom basin, and ensure that there is no water in the basin and the basin bottom. The hose can be extended and retracted with distance to firmly connect the basin bottom with the floor drain

third, after the test and protection are installed, a water test inspection is required to ensure that the water is unobstructed. The installed bottom basin shall also be protected in time before the installation of the room

fourth, locate and drill holes to clarify the drainage of pipes in the bathroom, so as to prevent the explosion of hidden pipelines during drilling. Use pencil and level ruler to determine the drilling position of aluminum materials against the wall, and use impact drill to drill holes

v. install aluminum materials, knock in rubber particles at the drill hole, and lock the aluminum strip on the wall with screws. Note that it is necessary to adjust continuously while installing to maintain the verticality of aluminum

VI. fix the glass and lock the glass clamp at the bottom basin drilling hole. The bottom of the flat glass or bent glass falls into the glass clamp groove and slowly push it into the wall aluminum material. Fix it with screws